The new Peculiar, Missouri fire station utilized CEO Structural Engineers’ Accelerated Building System which required only 32 pieces of red-iron and used no proprietary steel parts such as bar-joists or pre-manufactured steel bents. The frame was erected in record time allowing subsequent phases of construction to commence ahead of schedule. We congratulate the people of